OJI in association with Califco has been working with the government of Ebonyi State to Engineer, Procure, Construct and Transmission Lines and Distribution from the 2 – 5.2 Mega Watt Dual Fueled (Gas and Diesel) Turbine Power Plants to the 33/11 KVA Substation and to Ocho Udo City and Abakaliki International Market in Abakaliki, Ebonyi State, Nigeria.
Transmission & Distribution Services
- Overhead Transmission
- Underground Transmission
- Substations
- Medium Voltage Equipment
- High Voltage Equipment
- Auxiliary systems
- Protective relays
- Control systems
- Communication Network
- System Design
- Pre-commissioning Testing
- Commissioning